Home / Projects / Rama 8 Bridge — Inspection & HMS

Rama 8 Bridge — Inspection & HMS

Year
2024
Client
Bridges Department
Category
Civil Engineering

Project Overview

Visual inspection, bolt tightening, health monitoring system (HMS) upgrade, and comprehensive structural report for one of Bangkok's iconic cable-stayed bridges.

Scope of Work

  • Full visual inspection of cables, deck, and pylon
  • High-strength bolt tightening across connection points
  • Health Monitoring System sensor calibration and upgrade
  • Data collection and structural health analysis
  • Comprehensive inspection report with recommendations